specification section 16010

REPAIRS & RESTORATION OF SURFACES AND FINISHES: Restore all finishes, equipment and surfaces to original condition, where affected by the work. 16010 - 1 . Warranties and bonds. 0000005420 00000 n Variable frequency drives. Timkens deep groove ball bearings deliver reliable performance in a wide range of applications and conditions. Perform cutting, fitting, and patching of electrical equipment and materials required to: Uncover Work to provide for installation of ill timed Work. Cover temporary openings for electrical equipment to prevent the entrance of water, dirt, debris, and other foreign matter. while working on energized systems in accordance with NFPA 70E. .1 .2 ANSI/IEEE 837, Qualifying Permanent Connections . Place grout on concrete bases to provide a smooth bearing surface for equipment. Show all access doors for concealed junction boxes devices. 896 0 obj <>/Filter/FlateDecode/ID[<4733E1E0B7D7784ABE416F9437B1A7ED><5C11778FF49F854BA974624463381FF3>]/Index[878 27]/Info 877 0 R/Length 92/Prev 228199/Root 879 0 R/Size 905/Type/XRef/W[1 3 1]>>stream SCOPE OF WORK . Services include: Electrical penetrations include conduits and cables. G.|,b43f`0pXaE"zs aN 2. PDF DIVISION 16 - ELECTRICAL SECTON 16010 - GENERAL PROVISIONS Table of (Engineer shall edit specifications and blue text in header to meet project requirements. Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions. Div. 4. Project Area: The project area shall include the finished spaces and related sections of the utility shafts within the project area footprint. Include a detailed review of the following items: Maintenance manuals, including a customized list of preventive maintenance items and annual schedule for maintenance. YKY%+~GPtWx@@nZJ |9!H!7/"-m_1H0Nb+y CUTTING, WELDING, BURNING Before the contractor and/or any sub-contractor commences any cutting, welding, burning or other type of hot work at UMB, the contractor shall contact the UMB Fire Marshals Office located @ 620 W. Lexington Street, 6th Floor, Room 6113 or by phone @ 1-410-706-3494 to obtain a hot work permit. 2020 0 obj <>stream 0000002809 00000 n The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. Before initiating any work, a job specific work plan must be developed by the contractor. 1.01 . specifications electrical metallic tubing (emt) t&b detailed specifications for electrical items technical specifications for electrical work, electrical specifications - mouser electronics, electrical specifications & selection guide - delco remy, 2006 introduction to electrical construction specifications, standard in progress edition electrical specifications , electrical specifications manual override, electrical specifications & selection guide, electrical accessories and specifications, specifications for electrical installations, master specifications division 26 - electrical, general specifications for electrical installations, general specifications for electrical works, installation, specifications, service, electrical diagrams. %PDF-1.5 % Section 16050 - Basic Electrical Materials and Methods . 16010 - 1 . NETA (National Electrical Testing Association). Identification systems. Reference letters from minimum of three (3) registered professional engineers, general contractors, building owners, explaining proficiency, quality of work, or other attribute on projects of similar size or substance. hb```f``2c`a``cc@ >+PRQ0yXgZ-*``z=;K7<72a`19 7h9EmGn6]lyjz\t^io K7] 7x9L+N$ ?ylU#^yr08-;dg{w.\6%n#{6k5SnLl2sP$k$GI,2L PDF Section 16010 Electrical General Provisions Part 1 - General 1.1 Place markers in corner of tile. Contractor shall furnish manufacturer's electrical equipment of the types and sizes specified which has successfully operated for not less than the past two years, except where specific types are named by manufacturer and catalog number or designation under other Sections of the Contract Documents. l2f71S-K#C@EM{Wtq FINAL CLEANING General: General cleaning during construction is required by the General Conditions and included in Section Temporary Facilities. Install systems, materials, and equipment to conform with approved submittal data, to greatest extent possible. ph p hf h8 B* <>>> NFPA (National Fire Protection Association). PDF Section 16150 - Induction Motors - Eastern Municipal Water District xYsHwy+1pUd}{"!Z@{@\RQ_nM*]/UU-d&|d./lQy6y*)~]#gk6_q_T,@0RldC\EOgO+_nK|at{8u~6}QZ"%USXR_l?v0dHy $6 :r`qoL'mVXlBy~xn{tYi|"ey_jtANNkIA>e{B#(Op N7@{z#/\1a}a\'dD,B:=wT:8BT)v$8 !%KjK\=LOe:. hb```b````a``eg@ ~f(0wPN A8.I.qk``Fx6I Any defects in workmanship, materials, or performance which appear within the guarantee period shall be corrected by the contractor without cost to the owner, within a reasonable time, to be specified by UMB. BICSI and NICET certification, where required by these specifications. GUARANTEE/WARRANTY: All materials, equipment, etc. Single strip, continuous, flexible interlocked, double-wrapped steel, galvanized inside andoutside, forming smooth internal wiring channel. 2.0 GENERAL DESCRIPTION: A. Indicate scheduling, sequencing, movement, and positioning of large equipment into the building during construction. <>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 595.44 841.68] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>> Wall Pipe Sleeve Applications: Pipe sleeves shall be required for all new conduit penetrations through rated wall assemblies and non-rated CMU walls. IL?nL"a n[. PDF Abu Dhabi Sewerage Services Company (Adssc) General Specification for hSmk0+q7Pt%i!4GK~ ?lat"=Ye vydw \CnnXVmTG.1IgFb3muJ M6[]\.I!M{S}/Upc_Ov>Il/tc@U(Bvf-+u=oga$a #c.OyY7;njc dQ)lvy 7J As]S97}y9/7Qu{w}Sc1^~w/(omZB;.2 }@qQ Mg=?X2Wqg?p0O/&swW7qrdS&~ `Owe ]NXzN&~hQE2vJcU#BgO# E Samples shall indicate applicable specification section number and item numbers within that section. APPROVED EQUAL EQUIPMENT LAYOUTS Approved Equal Equipment Layouts: The equipment layouts and the related mechanical and electrical service connections, access space and supports indicated on the construction documents represent equipment provided by the specified basis of design manufacturer and model number. 1912 0 obj <>stream provided by the general contractor and/or his subcontractors shall be guaranteed and warranted to be free from defects in workmanship and materials for a period of two (2) years after date of certificate of completion and acceptance of work by UMB. Emergency operations. Any conduit abandoned in concrete slabs, walls, or other inaccessible locations shall be left with a nylon pull wire. This includes but is not limited to updating Equipment and/or Material Model Numbers indicated in the specifications and adding any additional specifications that may be required by the project. OUTAGES For all work requiring an outage, the electrical contractor shall submit an outage request to the UMB Project Manager, using the UMB Standard Request for Outage Form which is available through the UMB Design and Construction Web Site at HYPERLINK "https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/" https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/ The existing mechanical/electrical systems shall remain operational unless turned off by University personnel during the construction of the project. PROVISIONS FOR ACCESS Furnish and install adequate access to all electrical components. Electrical Performance Specifications Skagway Bazaar Building - Skagway, Alaska Page 1 of 10 . Arrange for chases, slots, and openings in building structure during progress of construction to allow for electrical installations. PROJECT PUNCH OUT Architect/Engineer will perform punch out reviews and will provide the Contractor with a list of punch list items to be completed before contract close out. Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical systems and equipment as indicated on the drawings and specifications and other electrical items made obsolete by the new Work. Part Number 16010, Narrow Section Ball Bearings (16000, 16100) Both riser and floor plan shall indicate address of devices where applicable. 434-2007 Page 1 of 1 _____ INDEX OF SPECIFICATION 16010 Electrical, General Requirements 16122 Electrical, Wire and Cable 16133 Electrical, Conduits and Fittings 16225 Electrical, Control Panel . DOC SECTION 16010 BASIC ELECTRICAL REQUIREMENTS - University of Maryland % Coordinate connection of electrical services. 0 For equipment requiring seasonal operation, perform instructions for other seasons at the same time. afdb`dg4baTfX:r-X5)H! %PDF-1.6 % endstream endobj 4189 0 obj <. Mandatory Requirements: The following requirements are mandatory: Protective Equipment: Electricians must use full protective equipment (i.e., certified and tested insulating material to cover exposed energized electrical components, certified and tested insulated tools, etc.) }H5@Gj\/vLBh@.\=r+TKi3Eg:xI=V{ T`WiRcfJ1Et*kIPd$ItI}J&]IES&IKO>Snv! Avoid air entrapment when placing grout. endstream endobj 2010 0 obj <>stream Installers' qualifications refer to the materials and methods required for the surface and building components being patched. %PDF-1.5 % o a$gd;F $ These cookies will be stored in your browser only with your consent. Test data for equipment, shielded cables and supply voltage shall be submitted to the District. PDF PROPOSED MULTIPURPOSE CENTER - International Organization for Migration vol. **"DHV1WtdRO2hK22K2*3e,jKs'{@Ee^hxNKK9 zBh9 endstream endobj startxref See underlined texts for Edits. %%EOF <> #Zkh f9\!A>V=#JM;:Dw. At a minimum, prepare coordination drawings for all mechanical rooms, electrical rooms and substation rooms. 0000001264 00000 n Cure placed grout according to manufacturer's printed instructions. i`h@M=#2Km,Iu9#y9Rd$gM$d,kVoN;$cJ+_:P:X:/}2P*C2P*C2X*c2X*c2X*cvgYt_{Mw?m{_/9Kt?to5hYE^E]_n]6#_\yn|02+=0PM1@T36YaeCb.c$PfHmT18f@5i32FMfp?M B. Electrical Works Technical Specifications - United Nations Development State of Maryland Fire Prevention Code. Coordinate connection of electrical systems with exterior underground and overhead utilities and services. Also turn off Underlines.) ph p h8 B* uI0b}q:_H:N=1pC_$;1j8OP$\;MX=+M36XzN6>t+u>fct1*l{m pe 3. It shall be the responsibility of the Installer to obtain all necessary data from the equipment supplied under other Divisions. Install electrical equipment to facilitate servicing, maintenance, and repair or replacement of equipment components. Each and every punch list item shall be initialed and dated by the Contractor when the work is complete. Access shall be as required by code and/or as determined by the Architect and Engineer. 11275 0 obj <>/Filter/FlateDecode/ID[<1BCD9CA6C4893D4A874390606B4A9A2F>]/Index[11261 22]/Info 11260 0 R/Length 76/Prev 791633/Root 11262 0 R/Size 11283/Type/XRef/W[1 2 1]>>stream As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. Coordinate installation of identifying devices after completing covering and painting where devices are applied to surfaces. 0000002122 00000 n All existing unsealed penetrations for services passing through existing rated assemblies within the project area shall be provided with sealant materials. VARIANCES Where variances occur between the drawings and specifications or within either document itself, the item or arrangement of better quality, greater quantity or higher cost shall be included in the contract price. [r'9}I!tn>oW KYa jRta4UIY3z$[gR%?F5r.jPSbei})lVZHk'vMTEJ|Agdd*z. endobj The convenience socket outlet and exhaust fan shall have a cross section of 4mm and a circuit breaker (1 x 16 A + N) unless otherwise mentioned on drawings. 904 0 obj <>stream mHs00\%Q` The electrical installer shall utilize a full time project foreman in charge of all electrical work. are not concealed by new work. All communication shall be through this person. .2 This shall generally include work in the following areas: ANSI (American National Standards Inst.). When the successful bidder chooses to provide or approved equal equipment by one (1) of the other listed manufacturers in the specifications, the bidder shall be responsible for providing all adjustments and modifications to the services necessary to make connections to the equipment, the bidder shall be responsible for installing the equipment such that all required clear access space is maintained, and the bidder shall be responsible for providing all adjustments and modifications to the equipment mounting and supports. If installers are not experienced in procedures, provide instruction by manufacturer's representatives. Compliance with the requirements of NFPA 70E is subject to ongoing inspection by University personnel and failure to comply will result in an immediate Stop Work order being issued and enforced at the contractors expense. ELECTRICAL. 3 electrical and mechanical specifications, specifications for electrical unit substation . Patch finished surfaces and building components using new materials specified for the original installation and experienced Installers. L1)Tj4d v"1s%H"r$-j` ,}# hmo Clean each surface or unit to the condition expected in a normal, commercial building cleaning and maintenance program. All electrical outages which will interfere with the normal use of the building in any manner shall be done at such times as shall be mutually agreed upon by the contractor and the Office of Facilities Management. DEMONSTRATION AND INSTRUCTIONS Demonstrate operation and maintenance of equipment and systems to Owners personnel a minimum two (2) weeks prior to date of final inspection. %PDF-1.6 % . Outages should be scheduled a minimum of ten (10) days in advance. Specifications and Drawings are prepared in abbreviated form and includes incomplete sentences. Obtain all necessary permits from SECTION 16010 ELECTRICAL GENERAL PROVISIONS SECTION 16010 ELECTRICAL GENERAL PROVISIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under this Section. INSPECTIONS Contractor shall: Schedule, pay for (as applicable) and attend all inspections required by the Authorities Having Jurisdiction. Patch, repair and repaint all walls and surfaces cut, penetrated or otherwise disturbed by the work. unless otherwise noted. Access doors. SECTION 16010 BASIC ELECTRICAL REQUIREMENTS . For each electrical outage request include a photograph of the panel index schedule for each panel affected by the outage. Division 16 Electrical SECTION 16010 - GENERAL PROVISIONS After such approvals, the CONTRACTOR shall submit the CADD- generated as-built originals, three (3) sets of prints and two (2) sets of electronic files to the CONSULTANT, as well as three (3) sets of operating and maintenance instructions, equipment and parts lists, including addresses of Local or State license where required. SUBMITTALS General: For general requirements see Architectural Specification Division 01 Section "Submittal Procedures". Deep groove ball bearing. Section 16151 - Vertical Hollowshaft Electric Motors . Obtain all necessary permits from %%EOF Trouble shooting. It is mandatory to procure user consent prior to running these cookies on your website. SEQUENCING AND SCHEDULING Coordinate electrical equipment installation with other building components. The Contract Documents are a single integrateddocument, and as such all Specification Sections apply. 4206 0 obj <>/Filter/FlateDecode/ID[<3C9B520689C7864B9A48B04B8892C8F0><70969F182CD17F458CE0C92FB6F87795>]/Index[4188 97]/Info 4187 0 R/Length 96/Prev 405976/Root 4189 0 R/Size 4285/Type/XRef/W[1 3 1]>>stream Hazards. 1 0 obj Remove wiring and conduit back to source panelboard or switch, or to last remaining device on the circuit. Include the following: Planned electrical systems layout, including conduit elbow radii and accessories. !y-P+O`_ )q|ero-UPO]GmlQ^+RDdi*>Z hbbd``b` $V Fg $s6e"A?a)L:= S ` + endobj Floor Pipe Sleeves Applications: Pipe sleeves are required for all new conduit risers passing through floor slabs. SECTION 16010 . qZ*`vC+6`tth?P^u^ 'EHC1ZK$q{)Q8E Comply with requirements of governing regulations, franchised service companies, and controlling agencies. For equipment rough-in requirements see specifications for electrical equipment. TURF CLUB 16010-1 GENERAL PROVISIONS MASTER F:\WORDPROC\ZEIJOBS\883-001\16010 SECTION 16010 GENERAL PROVISIONS PART 1 - GENERAL Related Documents: Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to this section. endstream endobj 1821 0 obj <>/Metadata 144 0 R/Outlines 346 0 R/Pages 1811 0 R/StructTreeRoot 599 0 R/Type/Catalog>> endobj 1822 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> endobj 1823 0 obj <>stream RECORD DRAWINGS (As Built) Upon completion of the electrical installations, the Installer shall deliver to the Architect one (1) complete set of marked-up blueprints of the electrical contract drawings. HWr8}W+mY4A7[SJhhH Fo7 RX O7/?. Provide connectors with insulating bushings. %PDF-1.5 % Properly store and handle all materials and equipment. endstream endobj startxref B. +"Y3`pHw]|Gq{5ST>#;@ @FF Reflected ceiling plan. 11-254 95% Construction Document Submission Phase January 03, 2012 BASIC ELECTRICAL REQUIREMENTS 260000 / = > ? Sizes and location of required concrete pads and bases. SECTION 16010 - GENERAL PROVISIONS. 3. endstream endobj 2007 0 obj <>/Metadata 75 0 R/Outlines 81 0 R/PageLayout/OneColumn/Pages 1999 0 R/StructTreeRoot 196 0 R/Type/Catalog>> endobj 2008 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Type/Page>> endobj 2009 0 obj <>stream This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . Operation. trailer ELECTRICAL INSTALLATIONS General: Sequence, coordinate, and integrate the various elements of electrical systems, materials, and equipment. NEMA (National Electrical Manufacturers Association). 0000001635 00000 n General: Construct concrete housekeeping pads to support mechanical equipment were indicated and as detailed on the drawings and as specified herein. PART 2 PRODUCTS LISTED MANUFACTURERS: Listed Manufacturers: The listed manufacturers indicated in Part 2 of each specification section as the basis of design represents the minimum level of quality for materials and equipment that is acceptable to UMB. _^QD!;\m6~D#}g}F\jf#Mt2tNT%$PkQwJuhN)2>IL gVV[ NYo8 bT6&/"I9k8rq#|,p]UW.nD,e$#)GY9AV/8JWh(tsU T/! ajF-PsWMmR6i?G Electrical inspection shall be by the [third (3rd) Party Inspector approved by the Maryland State Fire Marshall] [UMB inspection department personnel]. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. 6glqqS6&2S0gW Complete inventory of spare parts and materials. <> Where pipe sleeves are installed in non-rated CMU walls fire rated sealant materials are not required. These cookies do not store any personal information. PDF SECTION 17010 GENERAL REQUIREMENTS, INSTRUMENTATION ICS. - EandM Machine name and specification section number of driven machine. 16 ELECTRICAL GENERAL REQUIREMENTS Section 16010 Each section of raceway must contain an equipment grounding wire bonded at each end and sized as required. Cutting and patching. PDF Section 16050 - Basic Electrical Materials and Methods Adjustment. 0000001525 00000 n service companies, and controlling agencies. Narrow Section Ball Bearings (16000, 16100). to a point below the finished floors or behind finished walls and cap. 2006 0 obj <> endobj Cut such items flush with masonry surfaces. Install identifying devices prior to installing acoustical ceilings and similar concealment. SECTION 16010 - GENERAL PROVISIONS 1.0 GENERAL CONDITIONS: All sections under this Division shall be subject to the requirements of the Architect's General Conditions - UAP Doc. All submitted materials and equipment are subject to approval by the A/E and UMB. . Listing and Labeling: Provide products specified in this Section that are listed and labeled. 4284 0 obj <>stream containing a completed specification Section 17015 will be automatically considered unresponsive and will be rejected. XB^c*x=.l0 r Remove and replace Work not conforming to requirements of the Contract Documents.

Orleans Parish Tax Assessor Property Search, Napa Valley Reserve Membership Cost, French Bulldog Phoenix, Ballarat Clarendon College Staff, Articles S

specification section 16010